Permit & inspection path
National framing (typical)
- Site / placement conversation with installer: clearances from openings, property lines, combustible materials; exhaust direction; noise; HOA if any.
- Electrical permit for generator, transfer equipment, and related wiring.
- Fuel / mechanical / building permits as required for gas piping, tanks, pads, or enclosures.
- Licensed install — electrician for electrical; licensed gas work for fuel piping where required.
- Inspection(s) before covering work and before final approval / energizing as directed by the AHJ.
- Utility notice when required (some utilities want notification of standby equipment).
How to find your AHJ
- Search: “your city/county building department electrical permit generator”
- Call the building / permitting desk and ask: electrical vs mechanical for standby generators; who inspects transfer switches; owner-builder limits.
- Ask your licensed contractor which office they pull permits from for your address (city vs county vs state).
- National starting points (not a substitute for local rules): manufacturer install manuals + local amendments to the NEC / IRC.
Washington-flavored notes (verify)
- Washington electrical work is governed under state electrical law (RCW 19.28) with the NEC as adopted/amended. Many areas permit through WA L&I Electrical; some cities/counties run delegated electrical programs instead.
- Permanent standby + transfer equipment is typically treated as permitted electrical work performed by a licensed electrical contractor. Do not assume a homeowner permit covers transfer-switch / generator tie-in.
- Local jurisdictions may also want mechanical or land-use review for setbacks, pads, and LP tanks (example pattern: site plan + equipment cut sheets). Ask planning/building as well as electrical.
- Verify contractor licenses on L&I before you sign.
Outside WA: same idea — identify who issues electrical permits for your parcel, then ask about fuel and zoning overlays.
Questions to ask the AHJ / contractor
- Which permits are required for my address (electrical, mechanical, building, fire)?
- Is an ATS required for permanent standby here?
- Are interlocks allowed only for portable setups?
- What clearance / setback package do you expect on the site plan?
- Who calls in inspections, and in what order (rough / final; electrical before mechanical final)?
- Any utility notification or interconnection paperwork?
Red flags
- Bid that skips permits “to save money.”
- Offer to “just use a male-to-male cord” into a dryer outlet.
- Unlicensed electrical or gas work.
- No CO alarm discussion and no placement clearances on the proposal.